Лампа из гималайской соли Полиуретановые полы Mapei (Aquatus) Harvia (Aquatus) Ultratop Loft (Aquatus) Tiles for swimming pool (Aquatus) Офис фирмы Акватус Gold`s Gym & Dilijan International school (Aquatus) Продукция Mapei (Aquatus)

First start the pool (outdoor)

Первый запуск бассейна (открытый)

New swimming pool start up

Commissioning a newly-filled pool or starting in the spring

  1. When starting in the spring, re-install pool components removed for the winter, close drain valves and refit drain plugs.

  2. Fill the pool until the water level is in the centre of the skimmer opening.

  3. Fill the filter basket housing on the pump with water. NOTE: Never start the pump without water as this might damage the shaft seal.

  4. Open the valves of the suction, return and drain outlets.

  5. Turn the lever on the valve to BACKWASH.

  6. Start the pump. When the pump has evacuated the air out of the suction line (after about 1-3 minutes) and water is passing through the sight glass on the valve drain outlet, rinse for about 1-2 minutes or until the water in the sight glass is clear. NOTE: Any electric heater must be off.

  7. Stop the pump.

  8. Turn the lever to RINSE, start the pump and rinse for about 15-30 seconds. Stop the pump and turn the lever to FILTER. This is the normal operating position.

  9. Close the drain outlet valve and start the pump. NOTE: Always stop the pump before moving the lever of  the valve.

  10. Check the pH and adjust it to 7.2 to 7.6. Shock-chlorinate via the skimmer to a chlorine level of 2 ppm (mg/l). With repeated chlorine dosing, wait three hours between tests to give the chlorine time to dissolve. After 24 hours, brush the bottom and sides of the pool clean and vacuum the bottom of the pool.

All Right Recevied © 2000-2017 Aquatus Aquatus