Pot life of mix: 90 minutes.
Open time: 20 minutes.
Waiting time before grouting:
– on walls: 4-6 hours;
– on floors: 24 hours.
Set to light foot traffic: approx. 3 days.
Ready for use: approx. 14 days (21 days for basins and swimming pools).
Application: N° 5 or 6 or 10 notched trowel.
EMICODE: EC1 R Plus – very low emission.
Mixing ratio: 4 kg with 1 kg of KERACRETE.
Storage: 24 months. Protect from frost.
Consumption: 0.5-1 kg/m².
Packaging: 5 and 25 kg drums.
Keracrete Polvere
Keracrete Polvere
Synthetic latex rubber mixed with Keracrete Powder (white or grey) or with sand and cement (thickness up to 5 mm).