Application temperature: +5°C to +40°C
Drying time: 1-3 hours
Time to apply leveling compounds: within 24 hours
Consumption: 100-200 g/m2 depending on the absorbency of the base
Application temperature: +5°C to +40°C
Drying time: 1-3 hours
Time to apply leveling compounds: within 24 hours
Consumption: 100-200 g/m2 depending on the absorbency of the base