Application temperature: +5°C to +40°C
Drying time: 1-3 hours
Time to apply leveling compounds: within 24 hours
Consumption: 100-200 g/m2 depending on the absorbency of the base
Mapeprim SP
Mapeprim SP
Mapeprim SP is a two-component primer. After application and drying, it forms a durable film that is resistant to water and abrasion.